Sa’adat Abad Oil Field Development Project
 
| Project: | Sa’adat Abad Oil Field Development | 
| Client: | Iranian Central Oil Fields Company (ICOFC) | 
| EPC Contractor: | Global Petro Tech Kish E&P Company | 
| Engineering Subcontractor: | Rahbord Energy | 
| Project Location: | 90 km far from South-East of Shiraz | 
| Capacity: | Increase Production from 4.000 bbl/day to 7.000 bbl/day | 
| Technical Category: | Oil Wellheads and Flowlines | 
| Services Performed: | Detail Engineering, Procurement Eng. and Site Engineering | 
| Estimated Man-hour: | 15,000 | 
| Project Status: | Ongoing | 
